What requirements should be met for the decoration construction of dust-free workshop engineering
浏览次数:2090 时间:2023-05-19

Dust free workshop engineering is widely used in industries such as food, chemical, electronics, pharmaceuticals, and healthcare, and is an important measure to improve product quality. Next, let's talk about the requirements that Zhongtian Purification needs to meet in the decoration construction of the dust-free workshop project.

晶华-(113).jpg

Construction drawings for dust-free workshop engineering

1、 The construction of the dust-free workshop project should comply with the requirements of the project construction drawing design.

2、 The decoration of the dust-free workshop should meet the requirements of fire prevention, insulation, insulation, anti-static, vibration isolation, and noise reduction.

3、 The construction of dust-free workshop engineering should use materials that are not moldy, waterproof, washable, suitable for cleaning, and non volatile molecular pollutants.

4、 The decoration of the dust-free workshop should ensure the airtightness requirements of the clean room, and the material surface should not produce dust, adsorb particles, or accumulate dust.

5、 The construction of dust-free workshop engineering should meet the special requirements of product quality production process and should not release substances that have a harmful impact on product quality.

6、 It should comply with the national regulations on the limit of harmful substances in building decoration materials.

7、 The decoration of the dust-free workshop project should be carried out after the completion and acceptance of the main structure and roof engineering of the factory building. When decorating and renovating existing buildings with clean rooms, the on-site environment and existing facilities should be cleaned and cleaned to meet the requirements of clean construction before construction can proceed.

8、 During the decoration process of the dust-free workshop, the construction site should be closed and managed, including clean control of personnel, equipment and materials entering and exiting, to avoid the simultaneous construction of other sub projects with significant vibration and noise.

The above is Zhongtian Purification's understanding and analysis of "what requirements should be met for the decoration construction of dust-free workshop engineering". If you need to reprint it, please indicate the source. Thank you for your cooperation.



Follow QR code


Follow WeChat

Contact information
0755-27529763
Fax: 0755-27529763
Contact person: General Manager Yang 15989874906
Email: ztjh2011@sina.com
QQ: 1623105424
Address: 1306, Unit 1, Building 1, Lechuanghui Building, No. 1211 Guihua Community Sightseeing Road, Guanlan Street, Longhua District, Shenzhen, Guangdong Province
Copyright © Shenzhen Zhongtian Purification Engineering Co., Ltd. All Rights Reserved 粤ICP备17103103号